Ecological construction supervision report – Flood protection at the Schleinzbach in the cadastral community of Limberg – Restoration measures and reforestation

Client: Hengl Mineral GmbH

Project Duration: 2024

Project Description:
For the implementation of flood protection measures on the Limberg quarry site, TB Raab GmbH was commissioned to carry out ecological construction supervision. Responsibilities included overseeing construction activities and ensuring compliance with official permits. The ecological construction supervision team was involved in the planning process from the very beginning of the construction phase.

The project included the construction of a retention basin, along with additional hydraulic engineering measures such as an overflow weir and channel realignment, all within the Limberg quarry area owned by Hengl Mineral GmbH.

Ecological restoration measures and reforestation activities were successfully implemented as part of the project.

Untitled-design175-1
View of the lower end of the restoration section and the widened streambed. Willow stands and reed beds with broadleaf cattail (Typha latifolia) in the background were preserved (photo taken on 18 September 2023).
Untitled-design176
Schleinzbach after completion of the restoration works: structural diversity created through placement of boulders, periodically flooded areas, varying channel widths and depths, as well as choriotopes (substrate composition; photo taken on 18 September 2023).
hengl3
Location of the flood protection and restoration measures along the Schleinzbach in the cadastral community of Limberg, including areas designated for reforestation and compensatory planting.